An ATS specification: 12 items a project cannot pass without
Most transfer-switch specifications read the same way: "400 A ATS, open transition, IP54". That is not enough — a contractor is free to supply any switch that matches the text, including one with no event log and no frequency monitoring. Below are the 12 items that need real numbers, with typical values to start from.
1. What the specification must contain
| # | Item | What to state |
|---|---|---|
| 1 | Rated current and pole count | Current from the load calculation with margin; 2, 3 or 4 poles; for four-pole, switched or solid neutral |
| 2 | Short-circuit withstand | The value stated together with fuse type and rating — not on its own |
| 3 | Transfer type | Open, delayed (and its range), closed transition, bypass |
| 4 | Voltage and frequency | For example 400 V, 50 Hz; both values for dual-voltage schemes |
| 5 | Voltage settings | Mains trip threshold and return threshold, with time delays |
| 6 | Frequency settings | Separately for mains and generator — they are not symmetric |
| 7 | Enclosure rating and location | IP32 indoors or IP54 outdoors; ambient temperature |
| 8 | Control voltage | 12 or 24 V from the generator battery, or a separate source |
| 9 | Controller functions | Event log and its depth, real-time clock, number of start attempts, test timer |
| 10 | Signals to monitoring | Dry contacts or a protocol (Modbus, SCADA), with the list of states transmitted |
| 11 | Interlocks | Mechanical and electrical, preventing parallel operation of mains and generator |
| 12 | Tests and documentation | Factory test report, data sheet, manual in the project language, on-site load test |
2. Switch rating: calculated, not copied from the generator
The rating follows the design load current at 400 V three-phase: I = S ÷ (√3 × U). Round up to the next standard rating, then check it against the short-circuit withstand — in that order.
| Generator rating, kVA | Current at 400 V, A | Next ATS rating, A |
|---|---|---|
| 30 | 43 | 63 |
| 50 | 72 | 100 |
| 100 | 144 | 160 |
| 150 | 217 | 250 |
| 200 | 289 | 350 |
| 250 | 361 | 400 |
| 320 | 462 | 500 |
| 400 | 577 | 630 |
| 500 | 722 | 800 |
| 630 | 909 | 1000 |
| 800 | 1155 | 1250 |
| 1000 | 1443 | 1600 |
| 1250 | 1804 | 2000 |
Two caveats. First, if the switch carries the whole facility load when running on mains, the rating follows that load, not the generator — otherwise the switch is weaker than the supply. Second, with two generators in parallel the current through the switch is the sum, not the rating of one machine.
3. Short-circuit withstand: a number without a fuse means nothing
This is the item most often filled in wrongly. The published withstand applies only with a current-limiting fuse of the stated size; the switch alone was not tested at that current. The specification therefore states the pair.
| Switch rating, A | Withstand at 480 V with fuse | Fuse |
|---|---|---|
| 40–125 | 26 kA | up to 125 A |
| 160–250 | 38 kA | up to 250 A |
| 350–500 | 50 kA | up to 500 A |
| 630–800 | 55 kA | up to 800 A |
| 1000–1250 | 65 kA | up to 1250 A |
| 1600–2000 | 120 kA | up to 3000 A |
Values are per Cummins for a 480 V system. At 400 V the reference point is the fault level calculated at the switchboard, not a catalogue figure: the withstand in amperes stays the same, but it must be checked against the value for your scheme.
4. Settings: state numbers, not "standard"
A controller whose range is narrower than required has to be replaced, and it is better to learn that before purchase. The values below are typical, from Cummins specification SG-1478j for GTEC; ranges differ between manufacturers, the structure does not.
| Parameter | Mains | Generator |
|---|---|---|
| Voltage pickup | 80–95%, adjustable | 90% |
| Voltage dropout | 70–90%, adjustable | 75% |
| Overvoltage | 120% / 125%, all phases | — |
| Underfrequency | Off by default; 80% / 70% | 90% / 85% |
| Voltage sensing | All phases | One phase |
A specification wording that can be checked: "trip from mains when voltage falls below 85% for more than 2 s; return when above 92% for 3 min; start the generator 1 s after the trip". "Standard settings" cannot be checked.
5. Reading the model code
Where the project uses Cummins switches, the code is built on the GTEC matrix and fixes exactly what is usually lost in correspondence. Example: G T 3 0500 J N 5 2 A 000.
| Position | Meaning | Options |
|---|---|---|
| 1 | Product type | G — transfer switch |
| 2 | Transfer type | T — open or delayed transition |
| 3 | Poles | 2, 3, 4 |
| 4 | Rated current | 0063, 0100, 0125, 0160, 0200, 0225, 0250, 0350, 0400, 0500, 0630, 0800, 1000, 1250 |
| 5 | Voltage code | I — 220 V, J — 230 V, N — 220/380 V, O — 230/400 V, Q — 255/440 V, and others per the table |
| 6 | Control type | N — 12 V, Q — 24 V (line-to-neutral); L — 12 V, P — 24 V (line-to-line) |
| 7 | Frequency | 5 — 50 Hz, 6 — 60 Hz, 7 — 50/60 Hz |
| 8 | Construction | 2 — IP32, K — assembly kit |
| 9–10 | Revision and spec number | Assigned by the factory |
The practical value: the code pins down control voltage and voltage code, the two characters most often lost in email. One wrong character gives a switch that will not start the generator from its own battery.
6. Three mistakes that recur
- "No-break" instead of "open transition". The Russian translation of Cummins manual 914-0100G-13 says "no-break transfer switch GTEC" on the cover, although GTEC is an open-transition device. It is a translation error, and it propagates through project documents. Check the specification, not the cover.
- One rating for everything. The switch is sized on generator output while it also carries the facility load on mains — where the current is higher, so the switch runs overloaded.
- Event log "later". The controller level is chosen on price, and a year on nobody can establish why the facility went dark: no log, no clock, only LEDs.
7. What to check at acceptance
- Factory test report and data sheet in the project language — before installation, not after.
- Nameplate code matching the design: poles, current, voltage, frequency, control voltage.
- Presence and type of the fuses the withstand rating depends on.
- Actual settings after commissioning — a printout or a photo of the screen, not a verbal assurance.
- On-load transfer test: at least three cycles, with the voltage dip recorded.
- Interlock test: manual closing of the second source while the first is closed must be impossible.
- Signal-by-signal check of every state sent to monitoring.
Read next: Transfer switches and genset automation: grades and timing · UPS and genset: sizing the generator for a UPS load · How to select a genset by load
FAQ
Can an ATS be installed without fuses?
Physically yes, but the published short-circuit withstand no longer applies: the switch was tested only together with a current-limiting fuse of the stated size. The specification states the pair.
What rating is needed for a 200 kVA generator?
The current at 400 V is about 289 A, so the next standard rating is 350 A. If the switch also carries the facility load on mains, the rating follows that load instead.
Is a four-pole ATS needed?
It depends on the earthing system. A four-pole switch with switched neutral is needed where the generator neutral must not be bonded to the mains neutral. The designer decides from the earthing scheme, and the specification must state it explicitly.
What matters more — transfer type or controller level?
They answer different questions. Transfer type decides what happens to the load during the transfer. Controller level decides what you will know about why the transfer happened. Continuous process needs both; an office standby needs open transition and a simple controller.
Need a specification drafted or reviewed? Send the single-line diagram and the load list — we will check the calculation and select the switch for your scheme.