Transfer switches and genset automation: automation grades, timing and schemes
A diesel set does not know the mains has failed. The automation does: an ATS (called AVR in Russian practice, "automatic reserve input"), the genset controller and their timers. Here is what the Russian automation grades mean, what the seconds to voltage are made of and how transfer types differ.
1. Automation grades under Russian standards
For generating sets with internal combustion engines the standard is GOST R 53987-2010 (harmonised with ISO 8528-1). Its Russian annex DA describes the scope of automation by grade, and under GOST R 53174-2008 (table 5) the same scale applies to sets and power plants. Each grade includes the functions of the previous one.
| Grade | What the set does | Unattended running |
|---|---|---|
| 0 | Output stabilisation, circuit protection | — |
| 1 | Plus alarm and protection; automatically maintains normal running after start and load connection | 4 or 8 h |
| 2 | Plus remote and/or automatic control of start, running and stopping | 16 or 24 h |
| 3 | Plus automatic control of all processes, including parallel operation | 150 or 240 h |
| 4 | Plus remote condition monitoring with diagnostics | — |
For sets with tractor engines, annex DA gives other values for grade 3: 90 and 120 h. This shows the numbers depend on engine type and standard.
Where confusion arises. GOST 14228-80 grades the engine, not the power plant, and its hours differ. If a specification says "second grade", ask which standard: for power plants it usually means the 16/24 h scale of GOST R 53987 and GOST R 53174.
2. What "grade 2" means in practice
This is what is called a "genset with auto-start" or "with ATS". The set stands by; when the mains fails it receives a command, starts, accepts load, hands the load back when the mains returns, cools down and stops. It needs:
- a remote-start input on the genset controller (a dry contact from the ATS, dispatcher or timer);
- an ATS that watches the mains and transfers the load;
- engine heating and battery charging while on standby (see cooling and climate);
- a fuel reserve with automatic supply to the engine (see fuel system).
By manufacturer guides, grade 3 is needed where nobody visits the plant for weeks or where it must behave like part of a power system: automatic refilling of consumable tanks, automation of auxiliaries, remote monitoring and parallel operation (see parallel operation).
3. Why an ATS: supply-reliability categories
An ABB overview, citing the Russian PUE rules, says that for first-category loads and the special group automatic reserve control is required, with a local power plant allowed as the second source. For these loads an interruption is allowed only for the time the automation takes to act, so manual start is unsuitable. For the second category, according to a KTP-RU review, manual start by duty staff is formally permitted, but in practice nobody is on duty around the clock. The category of your facility is set by the design.
4. What the seconds to voltage are made of
In US critical-facility practice, NFPA 110 Type 10 requires restoring power within 10 seconds of an outage. In a Cummins analysis (PowerHour, 2019) the sequence for one set is:
- the ATS controller detects failure of the normal source;
- a delay before start, up to 1 s depending on the application;
- start signal, engine start and "ready to load", up to 8.5 s depending on the configuration;
- transfer from neutral to the emergency source and delays, up to 0.5 s depending on the switch.
That makes up to 10 s in this example (1 + 8.5 + 0.5, calculated). A Consulting-Specifying Engineer article puts start time at 5–7 s for a single set and 6–8 s for a large multi-set system, and notes that a delay used to ride through short mains dips can itself use up the 10-second budget; it suggests about one second.
For Russian sites the point is the same: time to voltage is the ATS delay plus engine start and run-up plus switching time. Check the set's time to accept 100 % load in its datasheet (GOST R 53174, clause 6.3.20, refers to GOST 10032) and keep a margin; if the load cannot tolerate even seconds of interruption, you need a UPS.
5. Transfer types
| Type | How it works | When used |
|---|---|---|
| Open transition | Break first, then make. On ASCO switches the break is about 30–50 ms depending on size; another source gives about 40 ms | The main choice for standby; loads that tolerate a short dip |
| Delayed transition | A centre-off pause of seconds to minutes lets motors and transformers shed stored energy | Large motors, transformers |
| Closed transition | Sources briefly run in parallel; on ASCO the overlap is under 100 ms | Planned transfers (tests, return to mains) without a dip |
Closed transition does not bridge a mains failure. It needs two live sources, so it works only on planned transfers; after a mains failure the switch transfers open. For the load to ride through that gap, stored energy is needed, which is the job of a UPS. Closed transition also means momentary parallel operation with the mains and needs approval of the grid operator (in US material, the utility and the authority having jurisdiction).
NFPA 110 requires mechanical interlocking, or an approved equivalent, between mains and set so the sources cannot be connected inadvertently. For a Russian site, the interlock requirements are set by the design.
6. Typical settings and schemes
- Delays. The ASCO Group 5 controller defaults to 1 s before the start signal, 30 min before retransfer after a failure and 5 min cooldown. This is one manufacturer's example, not a norm.
- Return to mains. A delay before retransfer prevents switching back to an unstable mains. After return the set runs unloaded for a while to cool.
- Schemes by number of inputs. ABB's overview lists 2-1 (two inputs, one output), 2-2 and cascaded 3-1 with a generator (G), where the second stage handles genset start and stop; input priority and delays are set on the unit.
- Mains monitoring. An ATS unit reacts to no voltage, undervoltage, overvoltage, unbalance and invalid frequency; thresholds are set for the load.
Where it falls short
- Standards and times in the tables are for reference. A design needs current editions and the set datasheet.
- Closed transition costs more and is harder to approve than open transition.
- A higher automation grade means more sensors, actuators and failure points: test-run the automation regularly.
What to put in the specification
- The automation grade and the standard it is defined in (GOST R 53987-2010, GOST R 53174-2008).
- The supply-reliability category of the load and the permitted interruption.
- Transfer type: open, delayed or closed, and whether a mechanical interlock is required.
- ATS delays: start, transfer, return, cooldown.
- Time to accept load and the list of first load steps.
- Remote monitoring, event log and interfaces (dry contacts, protocols).
FAQ
How does AVR differ from an ATS?
In meaning they are the same: automatic transfer of the load to a standby source. AVR is the Russian term, ATS (automatic transfer switch) the English one.
Is automation grade 2 enough for a building with a critical load?
For automatic standby, yes, but seconds pass between mains failure and voltage on the busbars. If the load cannot tolerate an interruption, add a UPS.
What is "second grade under GOST 14228"?
It grades the engine, not the power plant. For a power plant state the grade and hours under GOST R 53987-2010 or GOST R 53174-2008.