Construction of mini-CHP plants
Construction of mini-CHP plants

A mini-CHP plant is a small power plant that competes with, and often outperforms, buying energy from large energy companies in terms of cost-effectiveness. When new industrial enterprises and other energy-intensive facilities are opened, their own energy source may prove to be the only solution: even leaving aside the high cost of connecting to the grid, the connection itself takes a great deal of time.

Advantages of your own mini-CHP plant

  • fast payback;
  • uninterrupted power supply;
  • independence from the geography of third-party mains and freedom in choosing a site, which means additional savings on land costs and transport logistics;
  • fuel versatility: diesel, gas, associated gas, wood waste, biological waste;
  • full control over the architecture of the energy system: it can be integrated organically into your own process cycle and used as efficiently as possible;
  • insurance against tariff increases, external restrictions and limits;
  • scalability: capacity can be increased independently, as required or in advance;
  • environmental friendliness.

Equipment and output

The design of a mini-CHP plant includes the choice of fuel type and of specific power generating units. Diesel, gas turbine, gas piston or multi-fuel units can be used in any combination. Depending on the model, the capacity of a single unit ranges from several tens of kW to tens of MW.

The final product of the power generating unit may be:

  • electricity;
  • heat (steam, hot water);
  • cooling (water at a temperature suitable for air conditioning).

Payback

When assessing cost-effectiveness, it is necessary to take into account the cost of connecting the required capacity from external suppliers of energy resources. It is often so high that your own power generating unit becomes profitable from the first day of operation. If the facility is located right next to existing energy mains, the average payback of the power plant is about 4 years.

Why a full cycle of work matters

The return on investment in power generating units depends on how the project is implemented. A full process cycle must be provided:

  • design;
  • approval of the project with the supervisory authorities;
  • construction;
  • commissioning;
  • supervision throughout the entire operating period;
  • supply of spare parts and consumables;
  • the necessary energy audits.

You can look for separate contractors, each performing their own part of the work. In practice, however, this means numerous disputes caused by technological mismatches, and sometimes by quality problems.

To minimise the project timeline and budget, and to be confident that all issues that arise are resolved competently and without delay, it is better to entrust the whole project to a general contractor. Such an organisation is distinguished by:

  • qualified specialists;
  • experience of projects of various scales;
  • established links with suppliers of power equipment;
  • understanding of industry specifics;
  • a good reputation in the market.

LEVRUS LLC meets all of these requirements, and mini-CHP plants are among our priority products. Before making your choice, contact the LEVRUS managers and find out what terms we can offer: +7 (499) 500-24-60, info@levrus.ru.