LEVRUS LLC has supplied an equipment package for construction of a gas piston combined heat and power plant (CHP) with installed capacity of 17.5 MW based on two WARTSILA 20V34SG/10.5 kV units.

The station will operate on natural gas and includes two WARTSILA 20V34SG gas piston gensets (Finland) with electrical output of 2*8,730 = 17,460 kW, voltage of 10.5 kV and thermal output of 2*7,589 = 15,178 kW. The power plant is designed for both island mode and baseload operation in parallel with the grid.

   

Scope of supply

The scope of supply includes:

  • Heat recovery system (HRS);
  • Peripheral equipment package;
  • Process control system (PCS);
  • Set of tools and spare parts;
  • Modular building.

WARTSILA 20V34SG technical specifications

  • Shaft speed 750 rpm;
  • Time between major overhauls 90,000 operating hours;
  • Service life 300,000 operating hours.