Selection calculators: gensets, UPS and SHTYL stabilisers

Four tools: sizing a Cummins D5 diesel set from the load, estimating heat for recovery, choosing a SHTYL UPS, and choosing a SHTYL voltage stabiliser for a house, boiler, pump or machine tool. Gensets follow the Cummins method; UPS and stabilisers follow the manufacturer recommendations.

Calculator 1. Sizing a genset for your load

Enter the running load, the largest motor, and any UPS or variable-frequency drives. The calculator works out the required power by the Cummins method and lists matching sets from the D5 line (50 Hz). Leave empty any fields that do not apply.

How it is calculated

  • Running load. The sum of kilowatts drawn at the same time. The load-growth allowance multiplies this total.
  • UPS. Rating × (1 + battery charging share) × 0.9 ÷ 0.85, then the rectifier multiplier: 3-pulse 2.5; 6-pulse 2; 12-pulse 1.5. A UPS power factor of 0.9 and efficiency of 0.85 are the Cummins defaults when nothing else is known.
  • Variable-frequency drives. Output power ÷ 0.9 (efficiency), then a generator multiplier of 2.
  • Motor starting. Starting current multiple by method: direct on line 7, star–delta 2.5, autotransformer 4, soft starter 3, VFD 1.25 (times full-load current). Motor apparent power is estimated at 0.9 efficiency and 0.85 power factor. The alternator can briefly deliver up to 2.5 times rated current, and this is the condition being checked.
  • Result. The larger of two requirements is taken: steady-state load (kW, and kVA at 0.8 power factor) and motor starting.

Starting multiples differ between motor makers, and the Cummins guide says plainly that exact calculation needs data for the specific motor. The result gives an order of magnitude for choosing a model; it does not replace a check of voltage and frequency dip on starting.

Calculator 2. Heat for recovery

Choose a model and rating. The calculator shows cooling-system heat and an estimate of exhaust heat when the exhaust is cooled to the temperature you set. Use it as a guide when selecting a plate heat exchanger or a waste-heat boiler.

Where the data comes from

Cooling-system heat rejection (given in BTU/min on the sheet, converted to kW) comes from the factory DS sheet of each model at rated load; exhaust flow and temperature come from the same sheet. Exhaust heat is calculated by us: flow corrected to density at exhaust temperature × specific heat 1.10 kJ/(kg·K) × temperature drop. For 20 models the engine on the sheet matches the engine on the model page. For the others the calculation is not shown, to avoid misleading you (the X-series sheets for C8–C38 give no heat rejection, and neither do the C2750 and C3000 sheets).

Calculator 3. Choosing a SHTYL UPS for your load

Enter the load power, the largest motor (if any) and the time you need to run from batteries. The calculator lists UPS kits with batteries and UPS units without batteries from the catalogue. The rules come from the manufacturer recommendations, SHTYL Group.

Calculator 4. Choosing a SHTYL voltage stabiliser

For a house, boiler, pump or machine tool. Choose the mains type, enter the load power, the largest motor and the lowest voltage the mains sags to. The calculator lists inverter (InStab) and relay stabilisers from the catalogue.

How it is calculated

  • Load. Total electrical power of the consumers running at the same time, from the data plate (not the boiler heat output or the cooling power of an air conditioner). The power factor cos φ comes from the data sheet; 0.8 is used when it is unknown.
  • Allowance. The manufacturer recommends 20–30 % above the load including starting. 25 % is used by default.
  • Motor starting. Peak power = running load + (multiple − 1) × motor power. The multiples use the upper bound of the SHTYL table: circulation pump 5, submersible pump 7, machine tool and compressor 10, refrigerator and air conditioner 8, washing machine and vacuum cleaner 5, lift 7.
  • UPS. The starting peak is divided by 1.3 because of the UPS overload capacity. Kits are chosen by the run time on the model sheet at 80 % load; at a lower load the batteries last longer.
  • Stabiliser. The available power of SHTYL inverter models drops by about 20 % at 135–165 V input and by a further 20 % at 90–135 V. The calculator applies this for the minimum voltage you enter. Relay models are checked against the working input range on the sheet.
  • Whole flat or house. To protect the whole site, take the main breaker rating × 220 V: the stabiliser rating equals this value, or 20–30 % more if the mains sags below 165 V.
  • Three-phase mains, single-phase loads. Each phase of a three-phase stabiliser may carry no more than 1/3 of the rating, so the busiest phase is used for loads spread over phases.

Limits

  • The calculators ignore altitude, ambient temperature and alternator build, which reduce available power. These are listed on each model page.
  • Regenerative loads (cranes, lifts, excavators) need a separate calculation: returned energy above 10% of the rated power is dangerous for the set.
  • For non-linear loads with no detailed data, the Cummins guide advises a larger alternator: up to 30% non-linear share, size for full load; 30–60%, one rating up; above 60%, two ratings up.
  • The D5 line covers 6 to 2,200 kW prime and 8 to 3,000 kVA standby. Catalogue prices are on request.

Sources: Cummins, Liquid-Cooled Generator Set Application Manual (section 3, load calculation method), the application and installation guide for generator sets (motor starting, non-linear and regenerative loads), and the DS factory sheets of the D5 models. Catalogue: Cummins D5 diesel. For an exact calculation for your site, contact us. SHTYL Group selection guidance for stabilisers and UPS (shtyl.ru, “Equipment selection” and “Articles”): “How to calculate the power of a voltage stabiliser”, “Starting currents and how they affect the choice of a stabiliser and UPS”.

Frequently asked questions

How do I choose genset power for a load?

Add the running kilowatts, add the UPS and variable-frequency drive requirements, allow for starting the largest motor and for growth. Take the larger of the steady-load and starting requirements.

How many times larger than a motor should the generator be for direct starting?

The Cummins guide gives about 2.67 times the motor power, with a starting current six times running current and an alternator overload capability of 2.5. Real motors can draw 7–8 times, so the motor maker data is needed.

How is recoverable heat from a diesel set calculated?

Cooling-system heat comes from the factory sheet, and exhaust heat is calculated from exhaust flow and temperature. The result depends on the heat user temperature and on the exchangers.

How do I choose a voltage stabiliser for a gas boiler or a house?

Add up the electrical power of the appliances that run together, add a 20–30 % allowance and the starting power of motors (pumps, refrigerators). For a whole house take the main breaker rating × 220 V; if the mains sags below 165 V, add 20–30 %. For a boiler use its electrical power from the data plate, not its heat output.

How do I choose a UPS by power and battery run time?

The UPS output power should be 20–30 % above the load; motor starting is checked against the overload capacity of the model. Take the run time from the kit sheet: it is given at 80 % load, and at a lower load the batteries last longer.